Production scheduler
Skill a5c-ai/babysitter/library/specializations/domains/business/operations/skills/production-scheduler
Babysitter enforces obedience on agentic workforces and enables them to manage extremely complex tasks and workflows through deterministic, hallucination-free self-orchestration
npx -y skills add a5c-ai/babysitter --skill production-schedulerAssembled from the repository path, not quoted from the project. Check it against their README if it does not work.
What its author says it does
Copied from the file, not written here
Production scheduling optimization skill with constraint handling, changeover minimization, and due date management
SKILL.md
3.5 KB, 725 tokens by cl100k_base, as published. Nobody here has run it
Production Scheduler
Overview
The Production Scheduler skill provides comprehensive capabilities for optimizing production schedules. It supports finite capacity scheduling, changeover optimization, due date prioritization, and real-time rescheduling to maximize throughput and on-time delivery.
Capabilities
- Finite capacity scheduling
- Changeover sequence optimization
- Due date prioritization
- Machine assignment optimization
- Setup time reduction
- Order splitting strategies
- Schedule compression techniques
- Real-time rescheduling
Used By Processes
- CAP-002: Production Scheduling Optimization
- TOC-002: Drum-Buffer-Rope Scheduling
- LEAN-004: Kanban System Design
Tools and Libraries
- Scheduling algorithms
- Optimization solvers (Gurobi, CPLEX, OR-Tools)
- ERP scheduling modules
- APS systems
Usage
skill: production-scheduler
inputs:
orders:
- order_id: "ORD001"
product: "Widget A"
quantity: 500
due_date: "2026-02-10"
priority: "high"
- order_id: "ORD002"
product: "Widget B"
quantity: 300
due_date: "2026-02-12"
priority: "normal"
resources:
- machine: "Press 1"
available_hours: 16
products: ["Widget A", "Widget B", "Widget C"]
- machine: "Press 2"
available_hours: 16
products: ["Widget A", "Widget C"]
changeover_matrix:
"Widget A -> Widget B": 30 # minutes
"Widget A -> Widget C": 45
"Widget B -> Widget A": 25
scheduling_rules:
- "minimize_lateness"
- "minimize_changeovers"
outputs:
- production_schedule
- machine_assignments
- changeover_sequence
- on_time_performance
- utilization_metrics
Scheduling Objectives
| Objective | Description | Metric |
|---|---|---|
| On-time delivery | Meet customer due dates | % on-time |
| Throughput | Maximize output | Units/day |
| Utilization | Efficient resource use | % utilized |
| Changeover | Minimize setup time | Total setup hours |
| WIP | Minimize work in process | $ WIP value |
Scheduling Rules
Priority Rules
- EDD (Earliest Due Date) - Schedule by due date
- SPT (Shortest Processing Time) - Shortest jobs first
- FCFS (First Come First Served) - Order received
- CR (Critical Ratio) - Time remaining / work remaining
Sequencing Rules
- Grouping - Similar products together
- Optimal changeover - Minimize total setup time
- Color wheel - Light to dark, small to large
Schedule Optimization
Minimize: Total Lateness + (Changeover Time x Weight)
Subject to:
- Capacity constraints
- Due date requirements
- Material availability
- Resource skills
Real-Time Rescheduling Triggers
- Machine breakdown
- Rush order arrival
- Material shortage
- Quality issue
- Labor absence
Integration Points
- ERP/MRP systems
- Manufacturing Execution Systems
- Order management systems
- Shop floor data collection